Firstly, the weather has really improved and the outside is drying, only slowly as it is so cold. However we can see an opportunity to start the next phase of garden restoration.
Quite a demand but we think that we are achieving something close.
The mini fridge has arrived and has been installed.
Our poor old plumber is close to breakdown being confronted with installing his conventional heating and hot water system to our very contemporary biomass boiler arrangement but he is coping. The whole system is pressurised but he is limiting us to 3 bar. He says any more would take our skin off in the shower although the system will allow up to six bar. The very high tech pressurised hot water tank is installed.
No, it's not a Dalek |
We have been defeated on the solar panel front as everybody involved has let us down. The regulations require that we have one of those ridiculous EPC (energy performance certificates - like the ones you have on your fridge) before the system can be registered. We have five of the damned things and paid for all of them but they are not registered. We need an electric supply and don't have one. Electricity North West have, following the email to their CEO, leapt into action. They are pulling out all the stops, now, but they have to follow all of the procedures and cannot advise a connection date. They have now promised a back-up generator supply but we are told that this would be incompatible with a solar PV input. We will put all of this onto the back burner and will lose the Feed In Tarrifs even though we have paid for the installation.
The Boiler is amazing...!! the Fridge is pretty....hope the electrics get resolved....soon.
ReplyDelete